Skip to main content

Appendix C: Conceptual campus development renderings

The following conceptual renderings illustrate anticipated phases of campus development. These visualizations are intended for planning reference only and are subject to change as projects progress through formal design and approval stages.

Figure C1: Campus overview (2024)

Aerial view of a campus layout featuring buildings, parking areas, and sports fields surrounded by greenery.


Figure C2: Long-term campus vision:
The following map and tables illustrate a conceptual plan for phased campus development. While presented as a 30-year vision, the timeline may shift based on enrolment growth, academic needs and available funding. The accompanying tables break down estimated new space projections for each phase of development.

Site plan illustrating the proposed development layout, including existing and proposed buildings, parks, and pathways. Key features include a bus stop, parking areas, and a shared street network.

Figure C3: Concept rendering: Building 1A (2027)

Conceptual rendering of the Ontario Tech University student residence complex, featuring several modern buildings set amidst a green landscape.

Figure C4: Concept rendering: Building 1B (2028)
Architectural rendering of the Centre for Advanced Research, showcasing modern buildings surrounded by greenery and people walking.